Client : GKI Beringin
Area : ± 622 m²
Building Area : ± 2736.9 m²
The Ebenhaezer Church was designed during a transitional period from government regulations, we conducted a preliminary and detailed study, building regulations with a location with a potential for earthquakes, moreover the church is a meeting hall and is included in the category of important buildings. Despite the latest regulations and greater potential, the church was built at a lower height so it has a significant anticipatory failure.