PROJECT HIGHLIGHTS   |   MISCELLANOUS

GBI Ebenhaezer

Client                 :  GKI Beringin

Area                    :  ± 622 m²

Building Area   :  ± 2736.9 m²

The Ebenhaezer Church was designed during a transitional period from government regulations, we conducted a preliminary and detailed study, building regulations with a location with a potential for earthquakes, moreover the church is a meeting hall and is included in the category of important buildings. Despite the latest regulations and greater potential, the church was built at a lower height so it has a significant anticipatory failure.