PROJECT HIGHLIGHTS   |   HEALTHCARE

RSUD Pameungpeuk

Client                 :  Garut Local Governement

Area                    :  ± 21042.67 m²

Building Area   :  ± 8953.33 m²

RSUD Pameungpeuk was built around 2017 and has stopped for 3 years. Build within 6 stories of steel frame, the structure is planned to serve as general public hospital. As the construction stopped, the element of the structure has corroded and it’s dangerous to use. Struclab provide structural audit and analysis of the structures based on available code of ASCE 41-16. Some retrofit needed in some elements so the load of the elements can be well distributed against the strong earthquake. Using concentrically brace frame, structure can now be served well without collapse in several earthquakes that happened in the last year.